Home ➤ Projects ➤ Dismantling and installation of a video wall
Installation of a video wall requires special skills and is carried out by professional integrators in several key stages:
1. Assembly of supporting supports
The supporting supports are manufactured according to an individual project, a suitable bracket for the video wall is selected. Such a design must precisely correspond to the declared parameters, have no distortions, be easy to install, withstand additional loads, and meet fire safety requirements.
2. Preliminary inspection of modules
Each LED screen undergoes an additional check for operability, the presence of hidden defects, and compliance with technical requirements before installation. Otherwise, there is a risk of installing a defective module and subsequent time costs for dismantling and re-installing the equipment.
3. Joining panels
To form the highest quality image, LED screens with a minimum frame thickness are used as modules. This allows for seamless joining of panels.
4. Installation of switching equipment
At this stage, the equipment of the controllers responsible for processing video signals, laying communication lines and directly connecting signal sources to information panels is installed.
5. Configuration and testing
Checking the proper functioning of all video wall modules. Setting individual parameters: brightness, contrast, etc.
Upon completion of the configuration and testing work, the equipment is put into operation. The client is provided with a package of documents confirming that this project meets all the requirements of the technical specifications. A training course on the operation of the video wall is conducted. A guarantee is provided for the equipment, as well as for all types of installation work.
Task:
Dismantling, installation and transportation of a video wall consisting of 40 55-inch panels
Customer: Ministry of Agriculture of the Republic of Uzbekistan
Project implementation period: 19-09/21 from 30.09.2021